Delivery of the new, central drying and conveying system

17.04.2015
|

pic1
Pictured (from left to right):
Mrs. Leonte (Director STEWO Plastic Prod), Mr. Stelzer (owner STEWO) with Mr. Hain (Sales manager digicolor) and Mr. Färber (Färber industry representation) at the official handover of the new unit.

At the production site in Nasaud, STEWO has invested in modernization of the central material feed. The conveyor system leads automatically the plastic granulate through a complex system into the injection moulding machines and includes a built-in drying function. At the same the system has faster throughput times, works energy-saving and environmentally friendly.

Comments are closed.